Location - CANADIAN UNDERGROUND BASE METAL MINE
Material Handled - 6” Copper / Zinc Ore

Download Case Study

DOMITE vs AR 360, 425 & CCO

MATERIALS / DAYS IN SERVICE

LINER PLATE SPECIFICATIONS / WEAR RESULTS
MATERIALTHICKNESSTHROUGHPUT PER DAYLONGEVITY
AR 3601/2”8,200 tons 87 days
AR 4251/2”8,200 tons146 days
CCO1/2” (1/4 on 1/4)8,200 tons395 days
Domite1” (13/16 on 3/16)8,200 tons1321 days

DOMITE® OUTLASTED – PRORATED TO EQUAL THICKNESS OF 1”
AR 360 PLATE BY A RATIO OF 7.6 : 1
AR 425 PLATE BY A RATIO OF4.5 : 1
CHROME CARBIDE OVERLAY BY A RATIO OF 1.7 : 1