Case Study
Vibratory Feeders – Entry & Discharge Chute, Bottom & Side Liners
Down to Content
Location - CANADIAN UNDERGROUND BASE METAL MINE
Material Handled - 6” Copper / Zinc Ore
Download Case Study
DOMITE vs AR 360, 425 & CCO
MATERIALS / DAYS IN SERVICE
LINER PLATE SPECIFICATIONS / WEAR RESULTS
MATERIAL | THICKNESS | THROUGHPUT PER DAY | LONGEVITY |
AR 360 | 1/2” | 8,200 tons | 87 days |
AR 425 | 1/2” | 8,200 tons | 146 days |
CCO | 1/2” (1/4 on 1/4) | 8,200 tons | 395 days |
Domite | 1” (13/16 on 3/16) | 8,200 tons | 1321 days |
DOMITE® OUTLASTED – PRORATED TO EQUAL THICKNESS OF 1”
AR 360 PLATE BY A RATIO OF 7.6 : 1
AR 425 PLATE BY A RATIO OF4.5 : 1
CHROME CARBIDE OVERLAY BY A RATIO OF 1.7 : 1